CONTRACTS
Click on the contracts below to see details and images of our recent projects
THE PEAKS CENTRE
Sheffield
A college building constructed with no ceilings or acoustic control whatsoever, staff had problems with the acoustics from day one as the concrete structure is exposed
An acoustician proposed a certain amount of acoustically rated rafts be installed within each room. However every room layout was different and the rafts had to be installed between the existing services where space could be found. Eventually we managed to fit an amount of rafts within each room and the difference was noticeable immediately
All in all the client is delighted with the solution, a genuinely bespoke, if somewhat Heath Robinson, project
BACK TO CONTRACTS
BACK TO SERVICES